• reorganize cab0
    • mv ipp020 & ipp021 -> cab 6 & 7
    • mv cabinet rails back at least 6" to allow room for network cabling and/or zero 0 cable guides
  • mv all nodes to private network with a NAT pool
  • needed supplies
    • blackbox cable clamps
    • velcro tape
    • 1" white TZ tape
  • cable guides for the tops of cabinets 5, 6, & 7 (2 lost, 1 destroyed in shipping)
  • need 2' power cords and Y-power cords (supply out)
  • need to find the 1U rackmount monitor/keyboard + 30' vga cable or need to buy another unit
  • cab3pdu1 needs to be installed
  • depending on the size of wave4, more switch ports may need to be provisioned for
  • additional #2 screw drivers, it's amazing how easily these walk off.