Index: /trunk/doc/design/hardware_mgt.tex
===================================================================
--- /trunk/doc/design/hardware_mgt.tex	(revision 2242)
+++ /trunk/doc/design/hardware_mgt.tex	(revision 2243)
@@ -61,7 +61,4 @@
 \subsubsection{Stage 1}
 
-\begin{itemize}
-\item 75 days (20 days slack)
-\end{itemize}
 
 This covers the installation of the nodes, the network equipment plus specing
@@ -71,8 +68,4 @@
 
 \paragraph{Step 1}
-
-\begin{itemize}
-\item 2 FTE, 5 days
-\end{itemize}
 
 The IPP nodes will arrive pre-installed into standard 42U racks along with 1-2
@@ -88,8 +81,4 @@
 \paragraph{Step 2}
 
-\begin{itemize}
-\item 2 FTE, 50 days
-\end{itemize}
-
 The network and console wiring will be installed and connected to the ether
 the core switch or the console servers.  The IPP Cluster Test Plan can then
@@ -97,8 +86,4 @@
 
 \subsubsection{Stage 2}
-
-\begin{itemize}
-\item 0.1 FTE 50 days
-\end{itemize}
 
 The cluster enters into a period of partial dormancy where all but 6 of the
@@ -122,8 +107,4 @@
 \paragraph{Step 2}
 
-\begin{itemize}
-\item 1 FTE, 30 days
-\end{itemize}
-
 All IPP nodes are activated and subsections x-y of the IPP Cluster Test Plan are
 re-run.  Concurrently the new disks will be mounted into drive sleds, the
@@ -132,8 +113,4 @@
 
 \subsection{Production}
-
-\begin{itemize}
-\item 0.5+ (weekends?) FTE
-\end{itemize}
 
 During this phase the primary activity will be hardware maintenance.  This
@@ -147,8 +124,4 @@
 \subsection{End of Life}
 
-\begin{itemize}
-\item 0.15 FTE
-\end{itemize}
-
 The stacked static sky images will need to be preserved for transfer to the
 PS4 IPP cluster.  The static sky data shall be transfered to the 25 nodes
@@ -157,5 +130,32 @@
 PS4.  This phase will last approximate one year.
 
-\subsection{Schedule}
+\section{Schedule}
+
+\begin{center}
+\begin{tabular}{ll}
+Manpower Estimate&\\
+\cline{1-2}
+Commissioning           &\\
+\hspace{1cm}Stage 1     &75 days (20 days slack)\\
+\hspace{2cm}Step 1      &2 FTE, 5 days\\
+\hspace{2cm}Step 2      &2 FTE, 50 days\\
+\hspace{1cm}Stage 2     &0.1 FTE, 50 days\\
+\hspace{1cm}Stage 3     &\\
+\hspace{2cm}Step 1      &\\
+\hspace{2cm}Step 2      &1 FTE, 30 days\\
+Production              &0.5+ (weekends?) FTE\\
+End of Life             &0.15 FTE\\
+\cline{1-2}
+\end{tabular}
+\end{center}
+
+\begin{figure}
+\begin{center}
+\resizebox{7in}{!}{
+\includegraphics[angle=-90]{pics/ps1_ipp_cluster_timeline.ps}
+}
+\caption{ \label{Timeline} Timeline}
+\end{center}
+\end{figure}
 
 \appendix