IPP Software Navigation Tools IPP Links Communication Pan-STARRS Links

Changeset 1091


Ignore:
Timestamp:
Jun 24, 2004, 5:05:31 PM (22 years ago)
Author:
eugene
Message:

rebuilt figures, clarified SDRS text a bit

Location:
trunk/doc/design
Files:
8 edited

Legend:

Unmodified
Added
Removed
  • trunk/doc/design/ippSDRS.tex

    r810 r1091  
    1 %%% $Id: ippSDRS.tex,v 1.2 2004-05-29 00:56:14 eugene Exp $
     1%%% $Id: ippSDRS.tex,v 1.3 2004-06-25 03:05:31 eugene Exp $
    22\documentclass[panstarrs]{panstarrs}
    33
     
    13121312\subsubsection{Controller}
    13131313
     1314\tbd{can a process send a message back to the controller before
     1315  process is complete?  messages via controller?}
     1316
     1317\tbd{does the controller or the image server decide if a machine is
     1318  offline or both?}
     1319
     1320\tbd{I/O tasks vs CPU tasks?}
     1321
    13141322The IPP Controller is responsible for managing the processing stages.
    13151323The Controller manages the parallel processing of these stages in the
Note: See TracChangeset for help on using the changeset viewer.