Changeset 1091
- Timestamp:
- Jun 24, 2004, 5:05:31 PM (22 years ago)
- Location:
- trunk/doc/design
- Files:
-
- 8 edited
-
dataflow.sxd (modified) ( previous)
-
ippSDRS.tex (modified) (2 diffs)
-
pics/hardware.pdf (modified) ( previous)
-
pics/hardware.ps (modified) ( previous)
-
pics/overview.pdf (modified) ( previous)
-
pics/overview.ps (modified) ( previous)
-
pics/stages.pdf (modified) ( previous)
-
pics/stages.ps (modified) ( previous)
Legend:
- Unmodified
- Added
- Removed
-
trunk/doc/design/ippSDRS.tex
r810 r1091 1 %%% $Id: ippSDRS.tex,v 1. 2 2004-05-29 00:56:14eugene Exp $1 %%% $Id: ippSDRS.tex,v 1.3 2004-06-25 03:05:31 eugene Exp $ 2 2 \documentclass[panstarrs]{panstarrs} 3 3 … … 1312 1312 \subsubsection{Controller} 1313 1313 1314 \tbd{can a process send a message back to the controller before 1315 process is complete? messages via controller?} 1316 1317 \tbd{does the controller or the image server decide if a machine is 1318 offline or both?} 1319 1320 \tbd{I/O tasks vs CPU tasks?} 1321 1314 1322 The IPP Controller is responsible for managing the processing stages. 1315 1323 The Controller manages the parallel processing of these stages in the
Note:
See TracChangeset
for help on using the changeset viewer.
