Changeset 2243
- Timestamp:
- Oct 29, 2004, 3:25:32 PM (22 years ago)
- Location:
- trunk/doc/design
- Files:
-
- 1 added
- 1 edited
-
hardware_mgt.tex (modified) (8 diffs)
-
pics/ps1_ipp_cluster_timeline.ps (added)
Legend:
- Unmodified
- Added
- Removed
-
trunk/doc/design/hardware_mgt.tex
r2242 r2243 61 61 \subsubsection{Stage 1} 62 62 63 \begin{itemize}64 \item 75 days (20 days slack)65 \end{itemize}66 63 67 64 This covers the installation of the nodes, the network equipment plus specing … … 71 68 72 69 \paragraph{Step 1} 73 74 \begin{itemize}75 \item 2 FTE, 5 days76 \end{itemize}77 70 78 71 The IPP nodes will arrive pre-installed into standard 42U racks along with 1-2 … … 88 81 \paragraph{Step 2} 89 82 90 \begin{itemize}91 \item 2 FTE, 50 days92 \end{itemize}93 94 83 The network and console wiring will be installed and connected to the ether 95 84 the core switch or the console servers. The IPP Cluster Test Plan can then … … 97 86 98 87 \subsubsection{Stage 2} 99 100 \begin{itemize}101 \item 0.1 FTE 50 days102 \end{itemize}103 88 104 89 The cluster enters into a period of partial dormancy where all but 6 of the … … 122 107 \paragraph{Step 2} 123 108 124 \begin{itemize}125 \item 1 FTE, 30 days126 \end{itemize}127 128 109 All IPP nodes are activated and subsections x-y of the IPP Cluster Test Plan are 129 110 re-run. Concurrently the new disks will be mounted into drive sleds, the … … 132 113 133 114 \subsection{Production} 134 135 \begin{itemize}136 \item 0.5+ (weekends?) FTE137 \end{itemize}138 115 139 116 During this phase the primary activity will be hardware maintenance. This … … 147 124 \subsection{End of Life} 148 125 149 \begin{itemize}150 \item 0.15 FTE151 \end{itemize}152 153 126 The stacked static sky images will need to be preserved for transfer to the 154 127 PS4 IPP cluster. The static sky data shall be transfered to the 25 nodes … … 157 130 PS4. This phase will last approximate one year. 158 131 159 \subsection{Schedule} 132 \section{Schedule} 133 134 \begin{center} 135 \begin{tabular}{ll} 136 Manpower Estimate&\\ 137 \cline{1-2} 138 Commissioning &\\ 139 \hspace{1cm}Stage 1 &75 days (20 days slack)\\ 140 \hspace{2cm}Step 1 &2 FTE, 5 days\\ 141 \hspace{2cm}Step 2 &2 FTE, 50 days\\ 142 \hspace{1cm}Stage 2 &0.1 FTE, 50 days\\ 143 \hspace{1cm}Stage 3 &\\ 144 \hspace{2cm}Step 1 &\\ 145 \hspace{2cm}Step 2 &1 FTE, 30 days\\ 146 Production &0.5+ (weekends?) FTE\\ 147 End of Life &0.15 FTE\\ 148 \cline{1-2} 149 \end{tabular} 150 \end{center} 151 152 \begin{figure} 153 \begin{center} 154 \resizebox{7in}{!}{ 155 \includegraphics[angle=-90]{pics/ps1_ipp_cluster_timeline.ps} 156 } 157 \caption{ \label{Timeline} Timeline} 158 \end{center} 159 \end{figure} 160 160 161 161 \appendix
Note:
See TracChangeset
for help on using the changeset viewer.