  • trunk/doc/design/hardware_mgt.tex

    r2249 r2264  
    153153
    154154Approximately 4 months before the IPP Cluster needs to be fully operational the
    155 first lot of disks (600) shall be ordered.  The disks ordered should be the of
    156 the largest commonly avaiable capacity.  It is estimated that this will be
    157 400GB per disk when this stage is reached.  The disks maybe purchase lose or
    158 pre-installed in drive sleds if possible.  The disks most have a 3 year
     155first of three lots of 600 disks shall be ordered.  The disks ordered should be
     156of the highest capacity commonly avaiable.  It is estimated that this will be
     157400GB per disk when this stage is reached.  The disks maybe purchased loose or
     158pre-installed in drive sleds if possible.  The disks must have a 3 year
    159159warrenty either from the OEM or the disk manufacturer.  There will be a slack
    160 period of approximately 2-3 months while the purchase is approved and delivery
     160period of approximately two months while the purchase is approved and delivery
    161161is completed.
    162162
     
    166166are re-run.  If the $1^{st}$ lot of disks are purcashed lose they will be
    167167concurrently mounted into drive sleds, the disk mounting should take
    168 approximately 50 hours of labor.  The new disks shall then be run through the
    169 IPP Storage Test Plan.
     168approximately 50 hours of labor.  The new disks should be installed in sets of
     16912 on a single RAID controller in nodes [ipp000..ipp049].  The new disks shall
     170then be run through the IPP Storage Test Plan.
     171
     172\begin{figure}
     173\begin{center}
     174\resizebox{5in}{!}{
     175\includegraphics[angle=0]{pics/ps1_ipp_storage_lots.ps}
     176}
     177\caption{ \label{lots} Disk Lots}
     178\end{center}
     179\end{figure}
    170180
    171181\subsection{Production}
     
    174184includes replacing failed or about to fail disks, memory and other hardware
    175185components.  The cluster will need to be checked daily for disks in need of
    176 replacement. New operating system images and software will need to be
    177 installed on the cluster as needed.  Additionally, there will be two new lots
    178 of disks purchased that shall be passed through the IPP Storage Test Plan.
    179 The production phase will last approximately two years.
    180 
    181 \subsubsection{disks ordered}
    182 
    183 The $2^{nd}$ lot of storage disks are ordered, installed and tested.
    184 
    185 \subsubsection{disks ordered}
    186 
    187 The $3^{rd}$ lot of storage disks are ordered, installed and tested.
     186replacement.  Occasionaly, new operating system images and software will need
     187to be installed on the cluster.  Additionally, there will be two new lots of
     188disks purchased in this phase that will be passed through the IPP Storage Test
     189Plan.  The production phase will last approximately two years.
     190
     191\subsubsection{2nd Disk Lot}
     192
     193Approximately 6 months after the IPP Cluster enters into the Production phase
     194$2^{nd}$ lot of storage disks will need to be ordered.  The new disks shall be
     195installed in sets of 12 on a single RAID controller in nodes [ipp000..ipp049].
     196The new lot of disks will also need to be run through the IPP Stoage test plan.
     197
     198\subsubsection{3rd Disk Lot}
     199
     200Approximately 14 months after the IPP Cluster enters into the Production phase
     201the 3rd lot of disks will need to be ordered.  The new disks shall be installed
     202in sets of 24 on two RAID controllers in nodes [ipp050..ipp074].  This lot will
     203also be run through the IPP Storage test plan.
    188204
    189205\subsection{End of Life}
     
    222238\includegraphics[angle=-90]{pics/ps1_ipp_cluster_timeline.ps}
    223239}
    224 \caption{ \label{Timeline} Timeline}
     240\caption{ \label{timeline} Timeline}
    225241\end{center}
    226242\end{figure}
    227243
     244
     245\clearpage
     246
    228247\appendix
    229248
    230 \pagebreak
    231249\section{IPP Cluster Test Plan}
    232250