This is Heather's DR2 timeline (to the best of Heather's knowledge, estimates for how long things will take). It started as a google document (here: https://docs.google.com/spreadsheets/d/11kmgFIT_d8k_bjsz4hhbUBjWsI_1trBl2LmWzruKcEo/edit#gid=446405522 , likely only editable by Heathers), but I wanted it on the wiki. I can't figure out how to make better looking tables in trac, so I made screen shots.

I have made a rough timeline for DR2 (more like an outline). The smallest unit of time in my timeline is 1 week, and I (arbitrarily) decided that Gene and I can be tasked on up to 3 tasks for DR2 at a time, Conrad gets 1 task at a time. Some tasks are clearly serial, (like, build, calibrate,test database), while others can be parallel (make P2 batches and test diff database). I created this mostly so I could have some guess as to how long things could take.

Conrad's numbers are pulled from either asking him, or looking up how long things took for DR1.

My numbers are estimated from either DR1 or other sources. There is overlap on different types of batches - this is because loading tapers off as a batch type nears completion, and it's possible to start up another batch type. I'm happy to fill available time (once dvo is calibrated) with loading whatever batches I can, but I do expect it to take quite a lot of weeks to make the batches.

Gene's numbers are guesses (I am happy to correct as necessary)

Not included is the testing/verification/investigations of ipptopsps/psps things, which is quite time consuming during loading, as well as all other Panstarrs related tasks.