| Version 2 (modified by , 14 years ago) ( diff ) |
|---|
Heather's Tasks
Here is heather's list of tasks (related to IPP) to work on.
The most urgent
- u band stacks from MegaCam
- multiple requests from KP5, JT, and ZZ.
- remaining issues
- we have clean/good processed single exposures from CADC
- astrometry is funny for some of it due to lack of stars
- possible ideas to fix:
- force to be linear fits in astrometry
- force to fit the exposure rather than the individual chips
- possible ideas to fix:
- chop out the crappy astrometry ones and stack
- isp/skyprobe
- Roger/Niall want skyprobe
- astrometry/zeropoint problems
- does isp still not ingest properly RA/DEC/etc from fits file?
- psps
- further iterations of SASdvo -> ipptopsps -> psps
- will likely require changes to building dvos and ipptopsps
- further iterations of SASdvo -> ipptopsps -> psps
Lower priority Heather tasks
- ssp
- periodically download ssp from atrc (BAAAAD)
- work with jt to get monsta script and to process ssp (I have the scripts, need to automate them,etc)
- switch to datastore for grabbing files when ssp/uip computer gets sorted out
- when switched to datastore add ssp to summitcopy/registration
- uip - set that up as well (summitcopy/registration) - the uip machine is not ready yet
- gpc1 dvodbs
- continue building ThreePi?/LAP, backing up as necessary
- jtmd
- queue jtmd stuff as requested
Note: