  • IPP_Current_Tasks

    v162 v163  
    11== Current Tasks for the IPP Team ==
    22[[PageOutline]]
     3
     4 * Storage Distribution is still sub-optimal (Serge)
     5  * short term : better query to get to problem machines faster?
     6   * load by machine?
     7   * Serge improved the speed of the current shuffle query
     8   * Still not making much head-way -- why?
     9  * long term
     10   * Serge to write up list of desired feature additions
     11   * add 'target key' info to storage object
     12
     13 * Background noise patterns and false positives (Chris, Gene)
     14  * as of 2012.01.30
     15   * Chris determined that main structure comes from cell offsets
     16   * Chris modified the 'pattern' correction to match cell edge
     17   * g-band stack test run (don't know the results yet)
     18  * working group of Nigel, Gene, Chris, John, Doug
     19   * make sure background-fixed image is on distribution server (done)
     20   * visual inspection of the footprint stack
     21   * Chris inspected and found that the offset cells dominated
     22   * Nigel & Peter are going to give a list of issues
     23  * put together an assessment of the problem.  some possible issues:
     24   * streakies (signature is row-by-row structure)
     25   * dark / persistence (signature is elevated flux in special areas)
     26   * non-linearity correction failures (signature is elevated edge pixels or cells)
     27   * stack rejection problems
     28   * sky gradients (terrestrial)
     29   * moon glints or equivalent?
     30   * other issues we have not already seen?
     31
     32 * Inclusion of ubercal in the Grand Reprocessing (Gene)
     33  * plan for ubercal & relphot -> DVO is clear
     34   * code in place and tested, waiting for final verification from Eddie S.
     35   * up-to-date dvo db is rsync-ing (nearly done)
     36  * plan for DVO -> PSPS needs Roy
     37  * plan for stack header updates?
     38  * Gene & Roy meet Tue 1/10 to plan better I/O of DVO keys (done)
     39
     40 * Forced photometry / detectability server (Bill)
     41  * fix the simple stack problem
     42  * path for the update problems
     43
     44 * Desires by Transients team (Mark)
     45  * fix convolution direction
     46  * all MDS historical data reprocessed with V3
     47  * generate nightly stacks
     48  * psphot (single) on nightly stacks
     49  * calibrate (Gene)
     50
     51 * Extended source photometry
     52  * testing by David Th & Nigel
     53
     54 * Information/Documentation
     55  * DRAVG is going to organize FAQ
     56
     57''' stuff below is old and needs to be updated '''
    358
    459==== Top Priority Tasks ====