     6== Notes from WBS entries ==
     7
     8Here are the tasks that I believe we need for (a) and (b):
     9
     10a) Tasks required before the start of the survey:
     11
     12 * IPP to OTIS interface : the code is in place; we will turn this on with basic rules by the end of this week (3/12 - CZW)
     13 * Detectability Server : two items are required
     14  * the program 'psphotDetect' must be finished (3/19 - EAM/CZW)
     15  * integration with the postage stamp server (3/26 - WS)
     16 * Distribution System updated for Raw Data : (3/12 - WS)
     17
     18b) Tasks not required for the survey start:
     19
     20 * Finish Extended Source Analysis Code (3/31 - EAM)
     21 * Stack Photometry Process (4/30 - EAM)
     22 * Stack Rejection Issues : this is divided into three main tasks:
     23  * demonstrate MD stacks with internal (PS1-only) astrometry (3/19 - PAP)
     24  * improve masking strategy following advice from Durham (3/26 - PAP)
     25  * define the 3pi processing sequence for stacks (4/30 - PAP + EAM)
     26 * Full-Scale Photometry & Astrometry Relative Calibration Demo
     27  - this task can be done with SAS data (3/31 - CZW)
     28 * IPP to PSPS interface : this item consists of several sub-tasks (RH):
     29  * create initialization tables : done?
     30  * code to generate 'detections' table : done (but missing some fields?)
     31  * code to generate 'difference' table : done (but missing some fields? ingest untested?)
     32  * code to generate 'stack' table : done, but untested -- blocked by 'extended source' task above
     33  * resolve recalibration process : blocked by 'Full-Scale Photometry.. Demo'
     34 * ISP setup for automation (3/31 : HAF)
     35 * Distribution of Detrend Images : (4/15 : WS)
     36 * Integrated Release of Uncorrected Data : (4/30 : WS + PAP)
    537
    638== Tasks for the Immediate Future ==