Changes between Version 52 and Version 53 of IPP_Current_Tasks
- Timestamp:
- Mar 22, 2010, 8:53:30 AM (16 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
IPP_Current_Tasks
v52 v53 11 11 12 12 * IPP to OTIS interface : the code is in place; we will turn this on with basic rules by the end of this week (3/12 - CZW) 13 * '''DONE''' : we now need to iterate with OTIS 13 14 * Detectability Server : two items are required 14 15 * the program 'psphotDetect' must be finished (3/19 - EAM/CZW) 16 * '''DONE''' this was rolled into psphotForced, but output values must be double-checked 15 17 * integration with the postage stamp server (3/26 - WS) 16 18 * Distribution System updated for Raw Data : (3/12 - WS) 19 * DVO large-file upgrade : (3/21 EAM) '''DONE''' 20 * DVO merge catalogs : '''works expect for Image IDs''' 21 * DVO Image-indexing (current detection->image link is too slow for large dbs) 17 22 18 23 b) Tasks not required for the survey start: … … 22 27 * Stack Rejection Issues : this is divided into three main tasks: 23 28 * demonstrate MD stacks with internal (PS1-only) astrometry (3/19 - PAP) 29 * '''DONE''' -- this led to discovery of a 1/2 pixel error which caused many problems 24 30 * improve masking strategy following advice from Durham (3/26 - PAP) 31 * '''DONE''' 25 32 * define the 3pi processing sequence for stacks (4/30 - PAP + EAM) 26 33 * Full-Scale Photometry & Astrometry Relative Calibration Demo 27 34 - this task can be done with SAS data (3/31 - CZW) 35 * '''1st example done, needs another pass after DVO fixes''' 28 36 * IPP to PSPS interface : this item consists of several sub-tasks (RH): 29 37 * create initialization tables : done … … 35 43 * resolve recalibration process : blocked by 'Full-Scale Photometry.. Demo' 36 44 * ISP setup for automation (4/7 : HAF) 37 * Distribution of Detrend Images : (4/15 : WS) 38 * Integrated Release of Uncorrected Data : (4/30 : WS + PAP) 39 40 == Tasks for the Immediate Future == 45 * '''basic detrends created''' 46 * '''initial demo of chip and camera stages''' 47 * Distribution of Detrend Images : (4/15 : CZW) 48 * Integrated Release of Uncorrected Data : (4/30 : PAP) 49 50 == Tasks for the Immediate Future (these overlap the above) == 41 51 42 52 * major missing features : required for the start of the survey … … 69 79 * current operations tasks 70 80 * nightly processing 71 * Run 5b : waiting for Paul Sydney's OK72 81 * Run 5c 73 82 * M31 74 * Run 5b data75 * make uncorrected warps76 83 * make uncorrected deep stack 77 84 * diffs relative to deep stack (needs to update magic) … … 79 86 80 87 * current dev tasks 81 * fix forced photometry82 * pswarp errors83 * handle nebulous widows in scripts (done?)84 88 * addstar imports from UKIDSS & SDSS 85 * ISP detrends : define & set up processing86 89 * optmize dvo image lookups 87 90 … … 103 106 === Eugene Magnier === 104 107 108 * DVO image indexes / relastro optimization 105 109 * binned 4x4 mask for ken 106 110 * extended sources … … 113 117 === Heather Flewelling === 114 118 115 * set up ISP detrends 119 * more tests of ISP photometry and astrometry 120 * set up ISP nightly processing (to camera stage only) 116 121 * double-check output headers (try Chris' script) 117 122
