Changes between Version 55 and Version 56 of IPP_Current_Tasks
- Timestamp:
- Mar 29, 2010, 8:51:07 AM (16 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
IPP_Current_Tasks
v55 v56 10 10 a) Tasks required before the start of the survey: 11 11 12 * IPP to OTIS interface : the code is in place; we will turn this on with basic rules by the end of this week (3/12 - CZW)13 * '''DONE''' : we now need to iterate with OTIS 12 || IPP to OTIS interface || 3/12 - CZW || DONE || we now need to iterate with OTIS || 13 14 14 * Detectability Server : two items are required 15 15 * the program 'psphotDetect' must be finished (3/19 - EAM/CZW)
