| Version 1 (modified by , 15 years ago) ( diff ) |
|---|
Preparations for the Grand Reprocessing
This page lists tasks to be completed before the Grand Reprocessing can begin.
- Finalize Static Masks
- Address increased Magic Masking since 8/23 modifications
- Internal Calibration of reference catalog
- log-flux output for 3pi stacks
- Hardware installation: wave 1 refurb
Note:
See TracWiki
for help on using the wiki.
