| Version 2 (modified by , 17 years ago) ( diff ) |
|---|
IPP Progress Report for the week 2099.11.16 - 2209.11.20
(Up to IPP Progress Reports)
Eugene Magnier
Heather Flewelling
Bill Giebink
- Got DIMM operational by repairing relays; serviced DIMM
- Located and prepared requisitions for replacement and spare relays.
- Attended scaffold training.
- Spent a small amount of time on realtest.
- Worked with Tom and Steph to setup a laptop to serve accelerometer data.
Paul Price
Bill Sweeney
- Worked with people at MPIA to get the current version of the IPP built and installed at their site.
- Installed a data store at MPIA for them to use to submit postage stamp requests
- Modified the ipp data store tools to work through a proxy server.
- Helped monitor and debug issues in the destreaking and distribution portions of the pipeline.
- Figured out why diffs were taking so long to bundle. There was a bug in the pending query that caused runs to get bundled multiple times. Fixed this and deleted the duplicates from the data store.
- Finished postage stamp server "get_image" functionality. This will allow users to randomly select and download gpc1 data through the postage stamp server.
- Added the ability to select psf, cmf, and background model image to be included in postage stamp data products.
- At this point the processing portions of the postage stamp server are functionally complete. (The documentation needs to be updated though).
Chris Waters
Note:
See TracWiki
for help on using the wiki.