IPP_Progress_Report_20111121
v8 v9 55 55 * Started familiarizing myself with outputs of static sky analysis in preparation for creating the new "staticsky calibration" stage. 56 56 * modified the postage stamp server to distribute get_image data products around the cluster using nebulous. This avoids filling up the data store server's disk. 57 * debugged and fixed a problem with update processing that was causing postage stamp requests to get stuck waiting for updates. 57 58 58 59 === Chris Waters ===