| | 14 | * isp |
| | 15 | * updated isp database |
| | 16 | * processing several days of isp on ippc13 (as I notice a day finishes, I pr\ |
| | 17 | ocess another several days). The plan is to do this: |
| | 18 | * find/catalog failure modes of isp astrometry/photometry |
| | 19 | * build a dvocatalog |
| | 20 | * ssp |
| | 21 | * jt transferred ssp to ipp004 |
| | 22 | * heather created ssp database, and is in the process of ingesting the 100,00\ |
| | 23 | 0 ssp images (i'm about 95% done) |
| | 24 | * there are 2 copies of each in nebulous |
| | 25 | * jtmd stacks |
| | 26 | * mostly done! there are 45 missing ones that need investigation |
| | 27 | * helped pavlos - he can't install ipp, i'm working with hom on that |
| | 28 | * helped larry/peter on ipp installation |
| | 29 | * sick half day |
| | 30 | |