  • IPP_Progress_Report_20120227

    v12 v13  
    3636
    3737=== Chris Waters ===
    38 
     38 
     39 * SAS: finished rerunning SAS through the current tag code, and have talked to Heather and Roy about getting this into DVO and PSPS.
     40 * MOPS: Tracked down various issues that were causing MOPS trouble, the most important of which seems to be that MOPS was not respecting the crosstalk ghost detection flag.
     41 * Background: Looked into remaining gradients identified by Nigel.  These are small in the input image (1-2DN), but after stacking in the footprint, they become significant.  The row-to-row variations appear to be variations on top of this gradient, and because of that, the bright variations trigger false detections.  This has led to looking into the dark model, as it appears that our current dark is introducing some of these gradients.