| Version 3 (modified by , 12 years ago) ( diff ) |
|---|
Summary for MD.PV3 (updates in progress)
- MediumDeepFields summary page -- quick links to all up to date refstacks
- MD.GR0 summary page -- summary of all reprocessing details and 2011/2012 refstacks and some deepstack samples
- MD.PV1 summary page -- the data set that PV2 update reprocessing is based on
- MD.PV2 summary page -- update type reprocessing
This is a summary of the MD.PV3 full pixel reprocessing. Start date and schedule TBD.
This processing will also involve other MD-like fields, including M31, STS and CNP. Criteria for the stacks and diffims are TBD.
_Summary Status:_
- 10/1 start chip-warp?
chip -- warp
Should be started ASAP, so that the warps are available for some early testing of the stacks and diffims.
Testing necessary for the M31, STS and CNP processing still.
stack
Order of operations important -- while deep stacks take 1.5 months or so to finish, night and seasonal reference stacks must be finished before diffims can be started. Lighter jobs like difference images and iq (even reference stacks) can be run along with the deep stacks for some fields.
night =
seasonal reference
deep
iq
difference images
Cannot start until both night and seasonal reference stacks finish.
