| Version 12 (modified by , 17 years ago) ( diff ) |
|---|
Data Processing Requests
(Up to IPP_for_PS1)
This page is used to list and manage data analysis and distribution requests.
EAM: I've listed some of the requests of which I am aware. I've included in the table the current images available for the MD and M31 fields. We need a way to identify the minimum desired data before a stack is initiated. We also need a way to distinguish the request from the data currently being processed or completed.
Specific Stacks
| Priority | Summary | Contact | Description | chiptool arguments |
| 01 | M31 | Johannes K. | Initial Stack & Images of M31 from Run 4 (9 in r, 360 sec each) | |
| 02 | MD09 | Armin R. | Initial MD09 Stack from Run 4 (g,r,i,z,y) = (19,12,32,43,23 @ 2009.09.08) | -comment "MD09%" -dateobs_begin 2009/04/01 |
| 03 | MD10 | Armin R. | Initial MD10 Stack from Run 4 (g,r,i,z,y) = (4,4,16,8,0 @ 2009.09.08) | -comment "MD10%" -dateobs_begin 2009/04/01 |
| 04 | MD01 | Armin R. | Initial MD01 Stack from Run 4 (g,r,i,z,y) = (4,4,14,0,32 @ 2009.09.08) | -comment "MD01%" -dateobs_begin 2009/04/01 |
| 05 | MD02 | Armin R. | Initial MD02 Stack from Run 4 (g,r,i,z,y) = (0,0,0,1,14 @ 2009.09.08) | -comment "MD02%" -dateobs_begin 2009/04/01 |
| 06 | FlatCorr | Eugene M. | Flat-Correction Analysis | |
| 07 | y-fringe | Eugene M. | y-band fringe master analysis | |
| 06 | CMB Cold Spot | Istvan S. | Cold Spot from 2008 | -comment "CMB_Cold%" -label CMB_Cold_200909 |
Data Processing Status (090911-12:30amHST)
| Summary | label | burntool | chiptool | stacktool | difftool | magictool | other |
| MD09 | MD09.20090910 | finished | finished dates between 090401-090630 | problem with stacks, investigating | |||
| MD10 | MD10.20090911 | finished | |||||
| M31 | in progress |
Note:
See TracWiki
for help on using the wiki.
