| Version 16 (modified by , 17 years ago) ( diff ) |
|---|
Data Processing Requests
(Up to IPP_for_PS1)
This page is used to list and manage data analysis and distribution requests.
EAM: I've listed some of the requests of which I am aware. I've included in the table the current images available for the MD and M31 fields. We need a way to identify the minimum desired data before a stack is initiated. We also need a way to distinguish the request from the data currently being processed or completed.
Specific Stacks
| Priority | Summary | Contact | Description | chiptool arguments |
| 01 | MD09 | Armin R. | Initial MD09 Stack from Run 4 (g,r,i,z,y) = (19,12,32,43,23 @ 2009.09.08) | -comment "MD09%" -dateobs_begin 2009/04/01 |
| 02 | M31 2009 | Johannes K. | Initial Stack & Images of M31 from Run 4 (9 in r, 360 sec each) | |
| 03 | M31 2008 | Johannes K. | Fall 2008 g,i,z data | -dateobs_begin 2008/06/01 -dateobs_end 2009/01/01 -comment "%M31%" -filter g.00000,i.00000,z.00000 |
| 04 | MD10 | Armin R. | Initial MD10 Stack from Run 4 (g,r,i,z,y) = (4,4,16,8,0 @ 2009.09.08) | -comment "MD10%" -dateobs_begin 2009/04/01 |
| 05 | MD01 | Armin R. | Initial MD01 Stack from Run 4 (g,r,i,z,y) = (4,4,14,0,32 @ 2009.09.08) | -comment "MD01%" -dateobs_begin 2009/04/01 |
| 06 | MD02 | Armin R. | Initial MD02 Stack from Run 4 (g,r,i,z,y) = (0,0,0,1,14 @ 2009.09.08) | -comment "MD02%" -dateobs_begin 2009/04/01 |
| 07 | FlatCorr | Eugene M. | Flat-Correction Analysis | |
| 08 | y-fringe | Eugene M. | y-band fringe master analysis | |
| 09 | CMB Cold Spot | Istvan S. | Cold Spot from 2008 | -comment "CMB_Cold%" -label CMB_Cold_200909 |
Data Processing Status (090911-12:30amHST)
| Summary | label | burntool | chiptool | stacktool | difftool | magictool | other |
| MD09 | MD09.20090910 | finished | done | done | done | done | sent to Paul S. |
| MD10 | MD10.20090915 | finished | in progress | ||||
| M31 2009 | finished | ||||||
| MD01 | finished | ||||||
| MD02 | finished |
Note:
See TracWiki
for help on using the wiki.
