  • PS1_GR_psps

    v4 v5  
    1515Schedule MD07 next as we learn how long reprocessing an MD field takes. Then in parallel with 3pi GR, proceed with MD05 and 06. We would like to be ready to reprocess MD 08 and 09 by the time each has finished for the year.
    1616
    17 === PSPS ingest ===
     17=== PSPS ingest and availability ===
    1818
    1919June 30 - we will start ingesting of all the currently completed GR (LAP) DVO database NOW. When we have finished loading  the g and y band, by approximately July 12, we will delete all the old data currently in the PSPS, and do the first merge/indexing of the completed GR data. Note the g,r,i,z,y from the initial LAP test data overlapping Stripe 82 will be there as well, but the g,r, and i data have higher noise from the dark current.  This will take about two days during which PSPS will be offline.