IPP Software Navigation Tools IPP Links Communication Pan-STARRS Links

Changes between Version 2 and Version 3 of PS1_IPP_Czarlog_20150601


Ignore:
Timestamp:
Jun 1, 2015, 12:09:57 PM (11 years ago)
Author:
eugene
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • PS1_IPP_Czarlog_20150601

    v2 v3  
    77 * 05:50 EAM : pv3fflt does not have enough work queued and pv3ffrt is running very slowly in the bulge, so I've moved all of the machines to pv3ffrt, with reduced numbers of jobs per machine to avoid memory problems. once we are past the bulge, even for the outer galactic plane, we can add more jobs to those machines.
    88 * 12:00 CZW: power cycling stsci17.
     9 * 12:05 EAM: I have restarted mysql replication on ippdb03 (from ippdb05).  replication failed last week due to a corrupted binlog file.  I rsynced the database yesterday to ippdb05's local disk, then rsynced it last night to ippdb03.  this morning, I set up the replication configuration.  After discussing it with Heather, we have decided to keep the smaller camera databases (isp, uip, ssp) and the test databases (megacam, ps2_tc3) out of the replication stream to ippdb03.  Instead, I have rsynced those databases to ippc42 and will set them up to replicate there (we can conveniently use the same master log position information as for the other setup).   
     10
    911=== Tuesday : YYYY.MM.DD ===
    1012