IPP Software Navigation Tools IPP Links Communication Pan-STARRS Links

Changes between Version 2 and Version 3 of PSST_QUB


Ignore:
Timestamp:
Aug 21, 2015, 12:56:51 PM (11 years ago)
Author:
Mark Huber
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • PSST_QUB

    v2 v3  
    44Processing products --
    55 * WS diffim catalogs on datastore
    6  * PSS and rapid updates for historical stamps (warp+stack+diff)
     6 * PSS and rapid updates for historical stamps (warp+stack+diff)
     7 * cleanup timescales
     8  * for warp and WS diffim pixels -- 2 days ok?
     9  * for datastore cmf catalogs -- 1 month?
    710
    811Processing timescale -- ideal and last cutoff times for diffim catalogs to be available
     
    1316 * switch to PV3 stacks for grizy -- requires new ops tag, still some bugs in it
    1417 * gpc2 import of PV3 stack products -- requires new ops tag and then export/import of gpc1 stack rows to gpc2
    15 
    1618 * WSdiff daily test set --
    17 
    18  * PV3 w-band stacks --
    19 
    20  * gri synthetic w-band stacks for all sky --
     19 * PV3 w-band stacks -- some done at LANL, likely a good amount of reorganization work to be done as well as compute and disk space required
     20 * gri synthetic w-band stacks for all sky -- much development work, nodes and disk space required.
     21 * PSS should have option to turn up power for updates when large number of historical stamps are required (method to do so is unclear/undocumented..)
     22 * cleanup timescales -- 3PI(7d)+OSS(2d)+SNIa(?) are all various times..