Changes between Version 119 and Version 120 of Production_Work_Log
- Timestamp:
- Jul 28, 2014, 6:22:32 PM (12 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Production_Work_Log
v119 v120 2 2 3 3 = 2014 Production Node Work = 4 5 == July 28 (Haydn) == 6 - ipp033-036 - switched them from using 10Gb fiber to 1Gb Ethernet. 7 - ipp036 - disconnected it from 10Gb fiber. 8 - ipp071 - attached its top port to ipp036's fiber, which goes to the Cisco 6509-e, slot 4, port 4. Did my best to clean that port. 4 9 5 10 == July 16 (Haydn) ==
