    33= 2013 Production Node Work =
    44
     5== June 5 (Rita and Chad Richards) ==
     6
     7 - stsci10 - stsci19 were powered up and tested.  Chad discovered a bad Raid card on stsci15 and replaced it with LSI  MegaRAID 9280-8e RAID Controller which we had in our spares kit. RAID array rebuilding and should be complete later this evening.  Will be able to complete tests on this server tomorrow.
     8 - stsci15 had one failed RAID disk, which was swapped with one of the spares.  RAID array rebuilding and should be complete later this evening.  Will be able to complete tests on this server tomorrow.
     9 - all other servers were tested and passed the functional tests today.
     10 - plan to return tomorrow to complete testing of stsci10 and stsci15.  Will also take one load of the server boxes from the MHPCC server room to store at Waikoa.
     11
     12
    513== June 4 (Rita, Haydn  and Aspen engineer, Chad Richards ==
    614
    715 - worked the afternoon and unboxed and racked stsci10 - stsci19
    8 
    9 == June 5 (Rita and Chad Richards) ==
    10 
    11  - stsci10 - stsci19 were powered up and tested.  Chad discovered a bad Raid card on stsci15 and replaced it with LSI  MegaRAID 9280-8e RAID Controller which we had in our spares kit.
    1216
    1317== May 20 (Rita) ==