Changeset 2242 for trunk/doc/design/hardware_mgt.tex
- Timestamp:
- Oct 29, 2004, 12:15:48 PM (22 years ago)
- File:
-
- 1 edited
-
trunk/doc/design/hardware_mgt.tex (modified) (8 diffs)
Legend:
- Unmodified
- Added
- Removed
-
trunk/doc/design/hardware_mgt.tex
r2240 r2242 3 3 4 4 % basic document variables 5 \title{Pan-STARRS PS1 Image Processing Pipeline Hardware Manag ment Plan}5 \title{Pan-STARRS PS1 Image Processing Pipeline Hardware Management Plan} 6 6 \subtitle{System/Subsystem Specification} 7 7 \author{Joshua Hoblitt} … … 44 44 \section{Introduction} 45 45 46 This document presents the st agety for managing the PS1 IPP Cluster through47 it's life-cycle which will span a per oid of approximately 3 years. The plan46 This document presents the strategy for managing the PS1 IPP Cluster through 47 it's life-cycle which will span a period of approximately 3 years. The plan 48 48 covers hardware setup, validation, and operations. The life-cycle has been 49 49 broken down into three primary phases which in some cases have been decomposed 50 into smaller stages and steps .50 into smaller stages and steps for clarity. 51 51 52 52 \section{Life-Cycle} … … 116 116 117 117 Approximately 4 months before the IPP Cluster needs to be fully operational 118 the first lot of disks (600) shall be ordered. There will be a slack per oid119 of approximately 2-3 months while the purchase is approved and deliv iery is120 complete led.118 the first lot of disks (600) shall be ordered. There will be a slack period 119 of approximately 2-3 months while the purchase is approved and delivery is 120 completed. 121 121 122 122 \paragraph{Step 2} … … 127 127 128 128 All IPP nodes are activated and subsections x-y of the IPP Cluster Test Plan are 129 re-run. Concurrently the new disks will tbe mounted into drive sleds, the129 re-run. Concurrently the new disks will be mounted into drive sleds, the 130 130 disk mounting should take approximately 50 hours of labor. The 1st lot of 131 131 disks shall then be run through the IPP Storage Test Plan. … … 137 137 \end{itemize} 138 138 139 During this phase the primary activity will be hardware maint aince. This139 During this phase the primary activity will be hardware maintenance. This 140 140 includes replacing failed or about to fail disks, memory and other hardware 141 141 components. The cluster will need to be checked daily for disks in need of 142 142 replacement. New operating system images and software will need to be 143 installed on the cluster as needed. Additional y, there will be two new lots143 installed on the cluster as needed. Additionally, there will be two new lots 144 144 of disks purchased that shall be passed through the IPP Storage Test Plan. 145 145 The production phase will last approximately two years. … … 151 151 \end{itemize} 152 152 153 The stacked static sky images will need to be preserv ated for transfer to the153 The stacked static sky images will need to be preserved for transfer to the 154 154 PS4 IPP cluster. The static sky data shall be transfered to the 25 nodes 155 155 containing lot 3 disks. All but the 25 nodes containing lot 3 disks will be 156 deactivated. The deactiv iated nodes shall be stored for possible reuse with156 deactivated. The deactivated nodes shall be stored for possible reuse with 157 157 PS4. This phase will last approximate one year. 158 159 \subsection{Schedule} 158 160 159 161 \appendix … … 175 177 \subsubsection{Document overview} 176 178 177 This document describes the commis ioning test plan for the IPP Cluster179 This document describes the commissioning test plan for the IPP Cluster 178 180 hardware. 179 181 180 \subsection{Software test enviro ment}182 \subsection{Software test environment} 181 183 182 184 \subsubsection{MHPCC} … … 198 200 \paragraph{Network hardware} 199 201 200 \paragraph{Manag ment hardware}202 \paragraph{Management hardware} 201 203 202 204 \section{IPP Storage Test Plan}
Note:
See TracChangeset
for help on using the changeset viewer.
