IPP Software Navigation Tools IPP Links Communication Pan-STARRS Links

Ignore:
Timestamp:
Jan 18, 2006, 1:49:06 PM (21 years ago)
Author:
drobbin
Message:

chgd psMetadataType's to psDataType's. Moved SpherePrecess to EOC. checked in verified tests.

File:
1 edited

Legend:

Unmodified
Added
Removed
  • trunk/psLib/test/astro/verified/tst_psSphereOps.stderr

    r5455 r6039  
    4545/***************************** TESTPOINT ******************************************\
    4646*             TestFile: tst_psSphereOps.c                                          *
    47 *            TestPoint: psSphereOps{psSphereRotPrecess()}                          *
    48 *             TestType: Positive                                                   *
    49 \**********************************************************************************/
    50 
    51 <DATE><TIME>|<HOST>|I|testSphereRotPrecess
    52     Following should generate an error message
    53 <DATE><TIME>|<HOST>|E|psSpherePrecess (FILE:LINENO)
    54     Unallowable operation: toTime is NULL.
    55 <DATE><TIME>|<HOST>|I|testSphereRotPrecess
    56     Following should generate an error message
    57 <DATE><TIME>|<HOST>|E|psSpherePrecess (FILE:LINENO)
    58     Unallowable operation: fromTime is NULL.
    59 <DATE><TIME>|<HOST>|I|testSphereRotPrecess
    60     Following should generate an error message
    61 <DATE><TIME>|<HOST>|E|psSpherePrecess (FILE:LINENO)
    62     Unallowable operation: coords is NULL.
    63 
    64 ---> TESTPOINT PASSED (psSphereOps{psSphereRotPrecess()} | tst_psSphereOps.c)
    65 
    66 /***************************** TESTPOINT ******************************************\
    67 *             TestFile: tst_psSphereOps.c                                          *
    6847*            TestPoint: psSphereOps{testSphereOffset()}                            *
    6948*             TestType: Positive                                                   *
Note: See TracChangeset for help on using the changeset viewer.