IPP Software Navigation Tools IPP Links Communication Pan-STARRS Links

Ignore:
Timestamp:
Feb 16, 2006, 8:57:51 AM (20 years ago)
Author:
eugene
Message:

changes leading to CDR

File:
1 edited

Legend:

Unmodified
Added
Removed
  • trunk/doc/design/ippSCD.tex

    r6008 r6434  
    1 %%% $Id: ippSCD.tex,v 1.1 2006-01-16 00:39:24 eugene Exp $
     1%%% $Id: ippSCD.tex,v 1.2 2006-02-16 18:57:50 eugene Exp $
    22\documentclass[panstarrs]{panstarrs}
    33
    44% basic document variables
    55\title{Pan-STARRS PS-1 Image Processing Pipeline}
    6 \subtitle{System/Subsystem Design Description}
    7 \shorttitle{IPP SSDD}
     6\subtitle{System Concept Design}
     7\shorttitle{IPP SCD}
    88\author{Eugene A. Magnier, Paul A. Price, Josh Hoblitt}
    99\audience{Pan-STARRS PMO}
     
    1111\project{Pan-STARRS Image Processing Pipeline}
    1212\organization{Institute for Astronomy}
    13 \version{00}
     13\version{01}
    1414\docnumber{PSDC-430-011}
    1515
     
    2828DR.04     & 2004.04.13 & Most sections fleshed out \\ \hline
    2929DR.05     & 2004.04.29 & Reorganization for consistency \\ \hline
    30 DR.06     & 2004.10.21 & Major revision in prep of PDR \\ \hline
     30DR.06     & 2004.10.21 & Major revision in prep of PDR \\ \hline \hline
     3100        & 2004.11.04 & Incorporation of PDR Comments \\ \hline
     3201        & 2006.01.22 & Name change (SSDD to SCD) before CDR \\ \hline
    3133\RevisionsEnd
    3234
     
    9294\subsection{Document Overview}
    9395
    94 The Pan-STARRS IPP System/Subsystem Design Description (SSDD) contains
    95 the complete design description of the Pan-STARRS PS-1 IPP in order to
     96The Pan-STARRS IPP System Concept Definition (SCD) contains the
     97complete design concepts of the Pan-STARRS PS-1 IPP in order to
    9698achieve the requirements specified by the Pan-STARRS PS-1 IPP Software
    9799Requirements Specification (SRS; PSDC-430-005).  The requirements flow
    98 begun in the SGS and SCD and continued in the SRS is used to guide the
    99 design presented here.
     100begun in the SGS and full Pan-STARRS SCD and continued in the SRS is
     101used to guide the design presented here.
    100102
    101103\subsection{Requirements Definitions}
Note: See TracChangeset for help on using the changeset viewer.