IPP Software Navigation Tools IPP Links Communication Pan-STARRS Links
wiki:Sas39

SAS 39

Steps for creation and ingest of SAS39

(this is ipp processing not addstar):

  • Determine the labels / processing to be used
    • Camera: This should be the same as previous SAS done
    • Skycal: needs to be generated once psphot stuff is done (WS)
    • Full Force: Ready/ should be the same as previous SAS done
    • Diff: Same as previously?? EAM?
  • Code work for addstar
    • EAM: add feature in addstar to allow -list done
    • EAM: dvo schema / other bug fixes done
    • HAF: addstar multimode for FW and SC

  • Create AddStar Minis
    • Camera: should be done, if label is same as previous SAS
    • Skycal: waiting on label
    • Full Force: same label as before, need to rerun (dvo changes)
    • Diff: same label as before, need to rerun (dvo changes)
  • Merge / Calibration
    • Verify the Minis are not broken
    • Merge SAS39: 1. Skycal, 2. Cam, 3. FullForce
    • Merge SAS39DIFF: 1. Diff
    • Follow calibration steps for SAS39 / SAS39DIFF (should be the same)
  • IppToPSPS
    • Make sure that schema 21 is complete (should be)
    • Make changes to ipptopsps (schema changes) (should be done)
    • Make changes to ipptopsps (bug fixes)
    • Make batches
    • Make super batches for FW for PSPS
    • Verify batches, send to PSPS

  • Once ingested
    • test / verify / find problems (HAF/EAM/CH/TC/KCC + pspswg)

Last modified 11 years ago Last modified on Jun 26, 2015, 2:37:55 PM
Note: See TracWiki for help on using the wiki.